Network :
KL Monorail Line

Overview

The KL Monorail Line (MRL) is the first monorail system to be introduced into the Klang Valley Integrated Transit Network and coloured light green on the transit map. It is currently being operated by RapidRail Sdn Bhd under the brand of RapidKL.

KL Monorail Line is a fully elevated straddle-beam type monorail and designed to be a medium capacity rapid transit. It is currently 8.6km long with 11 stations from KL Sentral to Titiwangsa, and it takes about 30 minutes to travel from one end of the line to the other.

In operation since 2003, the line connects north and south of Kuala Lumpur, serving as a congestion alleviation transport in the heart of the city and the central business district.

At a Glance

31 Aug 2003

First Opened

8.6 KM

Total Length

11 Stations

6 Interchange Stations

Line Diagram

Stations

MR1 KJ15 KG15 KA1 KA1 KE1 KT1 KL Sentral

MR2 Tun Sambanthan

MR3 Maharajelela

MR4 AG9 SP9 Hang Tuah

MR5 Imbi

MR6 KG18A Bukit Bintang

MR7 Raja Chulan

MR8 KJ12 Bukit Nanas

MR9 AG5 SP5 Medan Tuanku

MR10 Chow Kit

MR11 AG3 SP3 PY17 Titiwangsa

Choose a station

Select a station from the list to view the information for the station.

Technical Specs

Type Medium-capacity Monorail Rapid Transit Train Length 4 cars
Length 46.4km Track Gauge Straddle Beam Guideway
Power Supply 750 V DC / Third Rail
Operation Type Automatic Train Protection with Driver
Stations 11 Grade of Automation GoA Level 1
Depots Brickfields Depot Signalling System Thales AlTrac ETCS Level 1