Network :The Kelana Jaya Line (KJL) is the second LRT system to be introduced into the Klang Valley Integrated Transit Network and coloured ruby on the transit map. It is currently being operated by RapidRail Sdn Bhd under the brand of RapidKL.
Kelana Jaya Line is an elevated LRT line with both underground and at-grade sections. It is our country’s first driverless metro and one of the world longest automated rapid transit when opened. Currently the line is 46.4km long with 37 stations from Gombak to Putra Heights.
In operation since 1998, the line Connects northeast and southwest of Klang Valley through the city centre and was later extended further south to serve the residential area at the southern end of Klang Valley.

1 Sep 1998
First Opened

46.4 KM
Total Length

37 Stations
10 Interchange Stations
KJ1 Gombak
KJ2 Taman Melati
KJ3 Wangsa Maju
KJ4 Sri Rampai
KJ5 Setiawangsa
KJ6 Jelatek
KJ7 Dato' Keramat
KJ8 Damai
KJ9 PY20 Ampang Park
KJ10 KLCC
KJ11 Kampung Baru
KJ12 MR8 Dang Wangi
KJ13 AG7 SP7 Masjid Jamek
KJ14 KG16 KA2 KA2 Pasar Seni
KJ15 KG15 MR1 KA1 KA1 KE1 KT1 KL Sentral
KJ16 Bangsar
KJ17 KD1 Abdullah Hukum
KJ18 Kerinchi
KJ19 Universiti
KJ20 Taman Jaya
KJ21 Asia Jaya
KJ22 Taman Paramount
KJ23 Taman Bahagia
KJ24 Kelana Jaya
KJ25 Lembah Subang
KJ26 Ara Damansara
KJ27 SA7 Glenmarie
KJ28 KD9 Subang Jaya
KJ29 SS15
KJ30 SS18
KJ31 SB7 USJ7
KJ32 Taipan
KJ33 Wawasan
KJ34 USJ21
KJ35 Alam Megah
KJ36 Subang Alam
KJ37 SP31 Putra Heights
Select a station from the list to view the information for the station.
| Type | Medium-capacity Light Rail Transit (LRT) | Train Length | 2 cars and 4 cars |
| Length | 46.4km | Track Gauge | Standard gauge (1,435mm) |
| Power Supply | +375/-375 V DC / Third & Fourth Rail | ||
| Operation Type | Unattended Train Operation | ||
| Stations | 37 | Grade of Automation | GoA Level 4 |
| Depots | Subang Depot | Signalling System | Thales Legacy CBTC moving block (formerly known as Alcatel S40) |