Network :The Kajang Line (KGL) is the first MRT line to be introduced into the Klang Valley Integrated Transit Network. It is coloured dark green on the system map, and currently being operated by RapidRail Sdn Bhd.
Kajang Line is an elevated MRT line with an underground section at the city centre. It is currently 46.0km long with 29 stations from Kwasa Damansara to Kajang.
The first and second phase of the Kajang Line opened in 2016 and 2017 subsequently. The line mainly serves the eastern and western region of the Klang Valley.

16 Dec 2016
First Opened

46.0 KM
Total Length

30 Stations
9 Interchange Stations
KG4 PY1 Kwasa Damansara
KG5 Kwasa Sentral
KG5A Teknologi
KG6 Kota Damansara
KG7 Surian
KG8 Mutiara Damansara
KG9 SA1 Bandar Utama
KG10 TTDI
KG11 Seksyen 17
KG12 Phileo Damansara
KG12A Bukit Kiara Selatan
KG13 Pusat Bandar Damansara
KG14 Semantan
KG15 KJ15 MR1 KA1 KA1 KE1 KT1 Muzium Negara
KG16 KJ14 KA2 KA2 Pasar Seni
KG17 AG8 SP8 Merdeka
KG18A MR6 Bukit Bintang
KG20 PY23 Tun Razak Exchange
KG21 Cochrane
KG22 AG13 Maluri
KG23 Taman Pertama
KG24 Taman Midah
KG25 Taman Mutiara
KG26 Taman Connaught
KG27 Taman Suntex
KG28 Sri Raya
KG29 Bandar Tun Hussein Onn
KG30 Batu 11 Cheras
KG31 Bukit Dukung
KG32 Taman Mesra
KG33 Sungai Jernih
KG34 Stadium Kajang
KG35 KB6 Kajang
Select a station from the list to view the information for the station.
| Type | Medium-capacity Mass Rapid Transit (MRT) | Train Length | 4 cars |
| Length | 47.0km | Track Gauge | Standard gauge (1,435mm) |
| 37.5km (Elevated) | Power Supply | 750 V DC / Third Rail | |
| 9.5km (Underground) | Operation Type | Unattended Train Operations | |
| Stations | 29 + 1 Provisional | Grade of Automation | GoA Level 4 |
| Depots | Sungai Buloh Depot Kajang Depot |
Signalling System | Bombardier CityFlo 650 |